| ArcGIS REST Services Directory | Login | Get Token |
| Home > services > Factmaps > FactMapsED50UTM32 (OGCFeatureServer) > collections > 254 > items | API Reference |
| JSON |
General
The primary objective of wildcat 7119/12-3 was to test possible hydrocarbon accumulations in sandstones of Middle to Lower Jurassic age. Gas and condensate were discovered in the sandstone sequences. Planned TD was 3765 m.
Operations and results
Exploration well 7119/12-3 was spudded with the semi-submersible installation Dyvi Delta on 20 may 1982 and drilled to TD at 3314 m in the Early Jurassic Nordmela Formation. A total of 121 days was spent on this well including testing and a 9.5 days seamen's strike. The time estimate was 106 days. No major problems occurred due to drilling. The well was drilled using spud mud down to 303 m, with gel/seawater from 303 m to 716 m, with gypsum/polymer from 716 m to 1618 m, and with gel/lignosulphonate from 1618 m to TD.
Hydrocarbon accumulations were discovered
in sandstone sequences between 3144 - 3285 m in the Stø Formation. From log
evaluation the interval contained 118 m net sand. The gas/water contact at 3285
m is based on the log evaluation. Due to very tight and hard formation only two
RFT pressure points were obtained out of 16 attempts (seal failures). Organic
geochemical analyses found only poor source rock potential in the well. Shales
in the Late Jurassic Hekkingen Formation from 3026 m to 3107 m had high TOC
levels in the range 3% to 9%. However, with Hydrogen Indexes only in the range
30 - 40 mg HC/g TOC in non-caved, high-TOC samples, these shales are gas prone,
and can not produce any significant quantities of liquid hydrocarbons. The well
is immature down to ca 2300 m and reaches oil window maturity at ca 3000 m.
Three cores were cut in the sandstones of the Middle to Early Jurassic Stø
Formation. The two first were cut in the interval 3145 m to 3154.85 m with 100
% recovery. The third was cut from 3250 m to 3267 m with 97 % recovery. One RFT
segregated sample was taken at 3187 m. The 2 3/4 -gallon chamber was bled off
on the rig. It had an opening pressure of 38.9 ba
wlbHistoryDateUpdated: 2016-05-19T00:00:00