ArcGIS REST Services Directory Login | Get Token
JSON

Factmaps/FactMapsED50UTM32 (OGCFeatureServer)


ID: 510
OBJECTID: 510
wlbNpdidWellbore: 519
wlbName: 7/11-7 R
wlbHistory:

General

Well 7/11-7 SR is a re-entry of exploration well 7/11-7 S, drilled from the Cod platform and suspended in December 1983, after testing of Jurassic, Triassic, and Permian targets. The objective of the re-entry was to utilize the well as a development well for the main Paleocene Cod reservoir.

Operations and results

Well bore 7/11-7 S was re-entered (7/11-7 SR) from the fixed installation Cod installation on 29 September 1984.

The well was completed on 8 October 1984 and reclassified to development well 7/11-A6.

Testing

No drill stem test was performed in the well.


wlbHistoryDateUpdated: 2016-07-06T00:00:00