| ArcGIS REST Services Directory | Login | Get Token |
| Home > services > Factmaps > FactMapsED50UTM32 (OGCFeatureServer) > collections > 254 > items | API Reference |
| JSON |
General
Well 25/1-7 was drilled on the main Frigg structure close to the UK border. The Frigg Field was discovered by well 25/1-1 in 1971. Production from the field started in 1977. A main objective of well 25/1-7 was to establish a reference monitoring station for the production of gas from the Frigg Field. The objective of the re-entry 25/1-7 R was to record the fluid contacts.
Operations and results
Semi-submersible installation Nortrym arrived the 25/1-7 location on 8 February 1987. When attempting to connect to the well head a fishing net was found wrapped around it. This was removed, and the well was re-entered (25/1-/ R) on 10 February 1987.
The well was logged (2135 m - 1900 m) through casing with a Thermal Neutron Decay (TDT) log to determine the fluid contacts. The contacts found were: base of deepest gas at 1924 m MSL, top of highest oil at 1929.2 m MSL, and top of highest water at 1931.7 m MSL. From this it was concluded: 1) The gas oil contact has risen at least by 13 m from initial, and about 11 m of this rise occurred since the 19 April 1985; 2) A gas bearing sand zone located above the shaly barrier at -1939 m MSL between 1939 m MSL and 1929 m MSL has been swept; 3) The oil water contact has risen by 19 m since 19 April 1985.
The well was suspended on 26 May 1985 as a gas appraisal well.
Testing
No drill stem test was performed.