| ArcGIS REST Services Directory | Login | Get Token |
| Home > services > Factmaps > FactMapsED50UTM32 (OGCFeatureServer) > collections > 254 > items | API Reference |
| JSON |
General
Well 30/6-23 R is a re-entry of well 30/6-23 on the Beta South structure on the Brage Horst south of the Veslefrikk Field in the North Sea. The objective of the re-entry was plugging and permanent abandonment.
Operations and results
Well 30/6-23 was re-entered with the semi-submersible installation Polar Pioneer on 16 May 1993.
The well was plugged and permanently abandoned on 21 May 1993.
Testing
No drill stem test was performed.