{
  "type" : "Feature",
  "links" : [
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items?f=application%2fjson",
      "rel" : "collection",
      "type" : "application/geo+json",
      "title" : "The collection document"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/399?f=json",
      "rel" : "self",
      "type" : "application/geo+json",
      "title" : "This document as JSON"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/399?f=text/html",
      "rel" : "alternate",
      "type" : "text/html",
      "title" : "This document as text/html"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/399?f=application/geo+json",
      "rel" : "alternate",
      "type" : "application/geo+json",
      "title" : "This document as application/geo+json"
    }
  ],
  "LayerId" : 254,
  "LayerName" : "Wellbore - History",
  "id" : "399",
  "properties" : {
    "OBJECTID" : 399,
    "wlbNpdidWellbore" : 404,
    "wlbName" : "31/6-4",
    "wlbHistory" : "\r\n\r\n\u003cp\u003e\u003cb\u003eGeneral\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eWell 31/6-4 was drilled in the southern\r\npart of the Troll East gas province. The main purpose was to appraise and test\r\npossible oil and gas accumulations in sandstones of Late to Middle Jurassic\r\nage. \u003c/p\u003e\r\n\r\n\u003cp\u003e\u003cb\u003eOperations and results\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eAppraisal well 31/6-4 was spudded with\r\nthe semi-submersible installation Deepsea Bergen on 5 March 1984 and drilled to\r\nTD at 820 m in Eocene sediments. After setting of the 30&quot; casing a 12\r\n1/4&quot; pilot hole was drilled. When opening the pilot hole to 26&quot; hole,\r\nthe hole holed kicked off from the pilot hole and deviated to 12.75 deg. at 662\r\nm. Because of the deviation it was decided to junk the well. The well was\r\ndrilled with spud mud.\u003c/p\u003e\r\n\r\n\u003cp\u003eNo cores were cut and no fluid samples\r\ntaken.\u003c/p\u003e\r\n\r\n\u003cp\u003eThe well was junked and abandoned on 16\r\nMarch as a dry well.\u003c/p\u003e\r\n\r\n\u003cp\u003e\u003cb\u003eTesting\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eNo drill stem test was performed\u003c/p\u003e\r\n\r\n\r\n\r\n",
    "wlbHistoryDateUpdated" : "2026-02-24T00:00:00"
  }
}