{
  "type" : "Feature",
  "links" : [
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items?f=application%2fjson",
      "rel" : "collection",
      "type" : "application/geo+json",
      "title" : "The collection document"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/500?f=json",
      "rel" : "self",
      "type" : "application/geo+json",
      "title" : "This document as JSON"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/500?f=text/html",
      "rel" : "alternate",
      "type" : "text/html",
      "title" : "This document as text/html"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/500?f=application/geo+json",
      "rel" : "alternate",
      "type" : "application/geo+json",
      "title" : "This document as application/geo+json"
    }
  ],
  "LayerId" : 254,
  "LayerName" : "Wellbore - History",
  "id" : "500",
  "properties" : {
    "OBJECTID" : 500,
    "wlbNpdidWellbore" : 509,
    "wlbName" : "30/3-1 R",
    "wlbHistory" : "\r\n\u003cp\u003e\u003cb\u003eGeneral\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eWell 30/3-1 R is located just north of\r\nthe Huldra Discovery. The primary well bore 30/3-1 was drilled in 1979 to a\r\ntotal depth of 3718 m where it was suspended due to an unexpected pressure\r\nbuild-up in the Early Cretaceous. The purpose of well 30/3-1 R was to re-enter\r\nthe previously abandoned well and continue drilling beneath the 9 5/8&quot;\r\ncasing shoe to test sandstones in the Brent Group. Secondary objectives were\r\nsandstones in the Early Jurassic, Cook and Statfjord formations. Well 30/3-1 R\r\n(Phase 2) was planned to be drilled 50 m into the Triassic to a total prognosed\r\ndepth of 4825 m.\u003c/p\u003e\r\n\r\n\u003cp\u003e\u003cb\u003eOperations and results\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eWildcat well 30/3-1 R was re-entered by\r\nthe semi-submersible installation Dyvi Delta on 1 January 1982 and drilled to\r\nTD at 4421 m (4395 m TVD) in Late Triassic sediments in the Statfjord\r\nFormation. After the 9 5/8&quot; casing had been drilled and cleaned out for\r\ncement plugs the string was lost in the hole when running in with a new bit.\r\nAfter several attempts to retrieve the fish, the hole was plugged back. A\r\nwindow was cut in the 9 5/8&quot; casing from 3657 m to 3672 m and the hole was\r\nkicked off from this depth after problems with lost circulation had been\r\nsolved. While drilling of the last part of the 8 1/2&quot; hole several\r\nincidents of stuck pipe was experienced. This section was plugged back with\r\ncement. When displacing the second cement plug, the pipe got stuck. After\r\ncutting the 5&quot; drill pipe an influx (gas and water) from the top of the\r\nStatfjord Formation was taken. The well built a deviation with maximum of 20.5°\r\nat 4165 m. The well was drilled with a Spersene XP 20/Magcogel/nut plug mud\r\nsystem from kick-off to TD. \u003c/p\u003e\r\n\r\n\u003cp\u003eHydrocarbons were encountered in thin\r\nsandstones interbedded with limestone, coals and claystones over the interval from\r\n3762 m to 3861 m in the Ness, Etive, and Rannoch formations in the Brent group.\r\nOne core was cut from 3863.6 m to 3875.2 m in the Brent Group. No fluid sample\r\nw",
    "wlbHistoryDateUpdated" : "2026-02-24T00:00:00"
  }
}