{
  "type" : "Feature",
  "links" : [
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items?f=application%2fjson",
      "rel" : "collection",
      "type" : "application/geo+json",
      "title" : "The collection document"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/707?f=json",
      "rel" : "self",
      "type" : "application/geo+json",
      "title" : "This document as JSON"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/707?f=text/html",
      "rel" : "alternate",
      "type" : "text/html",
      "title" : "This document as text/html"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/707?f=application/geo+json",
      "rel" : "alternate",
      "type" : "application/geo+json",
      "title" : "This document as application/geo+json"
    }
  ],
  "LayerId" : 254,
  "LayerName" : "Wellbore - History",
  "id" : "707",
  "properties" : {
    "OBJECTID" : 707,
    "wlbNpdidWellbore" : 1548,
    "wlbName" : "2/4-14 R2",
    "wlbHistory" : "\r\n\r\n\u003cp\u003e\u003cb\u003eGeneral\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eWell 2/4-14 R was designed to\r\nre-establish full well control of the uncontrolled flow in well 2/4-14 by using\r\nboth well 2/4-14 R and 2/4-15 S. Well 2/4-14 R2 is a result of the final\r\ncompletion of the blow out.\u003c/p\u003e\r\n\r\n\u003cp\u003e\u003cb\u003eOperations and results\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eThe re-entry 2/4-14 R2 was performed with\r\nthe semi-submersible installation Treasure Saga. Operations started on 6 April\r\n1990, after the jack up installation Neddrill Trigon had suspended the hole and\r\nleft location. Riser and LMRP was run and cement was drilled inside the 13\r\n3/8&quot; casing. The casing was cut at 169 m, the hole cleaned and a Baker PIP\r\npacker was set at 165 m in a second attempt. A leak in the 20&quot; casing was\r\nobserved between the wellhead and the packer. A balanced cement plug was set\r\nfrom 158 to 133 m. The 20&quot; and 30&quot; casings were cut at 99.5 m. A\r\nchannel through the cement between 20&quot; and 30&quot; casing was observed. A\r\ncement plug was set from 99 m to the seafloor.\u003c/p\u003e\r\n\r\n\u003cp\u003eThe well bore was permanently abandoned\r\non 14 April 1990 as a junked well.\u003c/p\u003e\r\n\r\n\u003cp\u003e\u003cb\u003eTesting\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eNo drill stem test was performed.\u003c/p\u003e\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n",
    "wlbHistoryDateUpdated" : "2026-02-24T00:00:00"
  }
}