{
  "type" : "Feature",
  "links" : [
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items?f=application%2fjson",
      "rel" : "collection",
      "type" : "application/geo+json",
      "title" : "The collection document"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/787?f=json",
      "rel" : "self",
      "type" : "application/geo+json",
      "title" : "This document as JSON"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/787?f=text/html",
      "rel" : "alternate",
      "type" : "text/html",
      "title" : "This document as text/html"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/787?f=application/geo+json",
      "rel" : "alternate",
      "type" : "application/geo+json",
      "title" : "This document as application/geo+json"
    }
  ],
  "LayerId" : 254,
  "LayerName" : "Wellbore - History",
  "id" : "787",
  "properties" : {
    "OBJECTID" : 787,
    "wlbNpdidWellbore" : 1868,
    "wlbName" : "7/7-2",
    "wlbHistory" : "\r\n\u003cp\u003e\u003cb\u003eGeneral\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eWell 7/7-2 is located ca 8 km east of the\r\n UK border on the Jæren High in the North Sea. It was the second commitment\r\nwell within the licence PL-148 and was designed to test the A-prospect,\r\ninterpreted as a Late Jurassic channel sandstone. Planned TD was in Permian\r\nsediments or 3500 m, whichever came first.\u003c/p\u003e\r\n\r\n\u003cp\u003e\u003cb\u003eOperations and results\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp\u003eWildcat well 7/7-2 was spudded with the\r\nsemi-submersible installation Deepsea Bergen on 20 January 1992 and drilled to\r\nTD at 3430 m in the Permian Zechstein Group. The well took 100 days to drill\r\nand test, 20 days more than planned. This was mainly due to a 25% higher pore\r\npressure than prognosed in the reservoir, resulting in a plug-back and 9\r\n5/8&quot; casing above reservoir, and not at TD as programmed. Other\r\ncontributing factors were re-spud after lost stinger in 30&quot; casing, two\r\noccasions of pulling BOP due to leakage and leak on swivel stem on top drive.\r\nThe DSTs experienced severe difficulties with leakage and operation of down\r\nhole valves resulting in two mis-runs with testing string and a shortened DST\r\nno. 2. The well was drilled with CMC EHV and seawater down to 904 m, with\r\nKCl/PHPA/PAC from 904 m to 2744 m, and with ANCOTEMP mud from 2744 m to TD. \u003c/p\u003e\r\n\r\n\u003cp\u003eThe greater part of the prospect, the\r\nLate Jurassic Ula sandstone was encountered at 3327 m, and proved to be sandy.\r\nThe Jurassic reservoir lithology consisted primarily of fine, well-sorted\r\nsilica-cemented sandstone with poor visual porosity. Subsequent testing from\r\n3348 - 3350 m showed a very tight formation, however testing from 3333 - 3342 m\r\nyielded oil. No oil-water contact was encountered, but organic geochemical\r\nanalyses detected oil saturation in two intervals from the top of the\r\nreservoirs down to 3341, and from 3345 down to 3347 m. \u003c/p\u003e\r\n\r\n\u003cp\u003eFour and a half m of shaley core was\r\nrecovered in two cores from 3242 m to 3247 in the Mandal Formation. Good oil\r\nshows were observed in these cores. Organic geochemical analyses proved them",
    "wlbHistoryDateUpdated" : "2026-02-24T00:00:00"
  }
}