{
  "type" : "Feature",
  "links" : [
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items?f=application%2fjson",
      "rel" : "collection",
      "type" : "application/geo+json",
      "title" : "The collection document"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/842?f=json",
      "rel" : "self",
      "type" : "application/geo+json",
      "title" : "This document as JSON"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/842?f=text/html",
      "rel" : "alternate",
      "type" : "text/html",
      "title" : "This document as text/html"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/842?f=application/geo+json",
      "rel" : "alternate",
      "type" : "application/geo+json",
      "title" : "This document as application/geo+json"
    }
  ],
  "LayerId" : 254,
  "LayerName" : "Wellbore - History",
  "id" : "842",
  "properties" : {
    "OBJECTID" : 842,
    "wlbNpdidWellbore" : 2080,
    "wlbName" : "34/8-8 R",
    "wlbHistory" : "\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cb\u003e\u003cspan lang=EN-GB\u003eGeneral\u003c/span\u003e\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eWell 34/8-8 R is a re-entry of appraisal\r\nwell 34/8-8 on the N-1 segment of the 34/8-1 Visund discovery on Tampen Spur in\r\nthe Northern North Sea.\u003c/span\u003e\u003cspan lang=EN-GB\u003e \u003c/span\u003e\u003cspan lang=EN-GB\u003eThe\r\nprimary objective of well 34/8-8R was to determine the pressure regime and\r\npressure gradient in the hydrocarbon bearing sands in Tarbert, Ness and Etive\r\nformations. The secondary objective was to determine the fluid\r\nsystem/composition and the possible presence of a gas oil contact in the\r\nTarbert/Ness formations. The third objective was to investigate the mobility of\r\noil and water down to the interpreted free water level (FWL)\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cb\u003e\u003cspan lang=EN-GB\u003eOperations and results\u003c/span\u003e\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eWell 34/8-8 was re-entered on 16 February\r\n1993 with the semi-submersible installation Polar Pioneer.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eThe well was drill stem tested. No significant\r\nproblems occurred in the operations. \u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eNo cores were cut and no wire line fluid\r\nsamples were taken.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eThe well was permanently abandoned on 9\r\nMarch 1993 as an oil appraisal.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cb\u003e\u003cspan lang=EN-GB\u003eTesting\u003c/span\u003e\u003c/b\u003e\u003cspan lang=EN-GB\u003e \u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eTwo drill stem tests were performed. In\r\nboth tests production logging (PLT) was performed during the main flow.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eDST 1 tested the interval 2960.2 to\r\n2973.2 m in the Ness/Etive formations. The test sequence consisted of an\r\ninitial and a cleanup flow/build-up period with down hole shut-in. The main\r\nflow with PLT was interrupted by poor weather conditions and the well was\r\nimmediately killed. Only a limited amount of the surface sampling program was\r\ntherefore accomplished. No down hole sam",
    "wlbHistoryDateUpdated" : "2026-02-24T00:00:00"
  }
}