{
  "type" : "Feature",
  "links" : [
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items?f=application%2fjson",
      "rel" : "collection",
      "type" : "application/geo+json",
      "title" : "The collection document"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/930?f=json",
      "rel" : "self",
      "type" : "application/geo+json",
      "title" : "This document as JSON"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/930?f=text/html",
      "rel" : "alternate",
      "type" : "text/html",
      "title" : "This document as text/html"
    },
    {
      "href" : "https://factmaps.sodir.no/api/rest/services/Factmaps/FactMapsWGS84/OGCFeatureServer/collections/254/items/930?f=application/geo+json",
      "rel" : "alternate",
      "type" : "application/geo+json",
      "title" : "This document as application/geo+json"
    }
  ],
  "LayerId" : 254,
  "LayerName" : "Wellbore - History",
  "id" : "930",
  "properties" : {
    "OBJECTID" : 930,
    "wlbNpdidWellbore" : 2695,
    "wlbName" : "7/12-12 S",
    "wlbHistory" : "\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cb\u003e\u003cspan lang=EN-GB\u003eGeneral\u003c/span\u003e\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eWell 7/12-12 S was drilled as a reach-out\r\nwell from the Ula Platform to a fault block separate from the main Ula Field ca\r\n4 km south-southwest of the Platform location. The primary objective was to\r\ntest the reservoir and hydrocarbon potential in the Ula Formation. In the event\r\nof a discovery the plan was to complete the well as a producer.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cb\u003e\u003cspan lang=EN-GB\u003eOperations and results\u003c/span\u003e\u003c/b\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eOperations on wildcat well 7/12-12 S\r\nstarted on 9 October 1995. The well was drilled from the Ula Platform and was kicked\r\noff at 547 m in existing development well 7/12-A-10 the 14th of November 1995. After drilling to 16&quot;\r\nhole section TD at 2498 m the hole packed off and the string got stuck. Several\r\nattempts were made to retrieve the fish, but failed. A balanced kick-off plug\r\nwas set and the well was sidetracked (7/12-12 S T2) from 958 m and drilled to\r\nfinal TD at 6079 m (4067 m TVD) in interbedded sands, silts and shales of\r\npossible pre-rift age. The well was drilled with Enviromul oil based mud from\r\nkick-off to TD. Considerable hole problems occurred during drilling. There is a\r\ndiscrepancy of up to 7 m between drilled and logged depth below 5482 m. Depths\r\ngiven here are drilled depths.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eTop Reservoir (Ula Fm) was penetrated at\r\n6018 m MD (4020 m TVD), 118 m TVD deeper than predicted. Base Ula Formation was\r\npicked at 6067 m MD (4057 m TVD).Wire line logging and lack of shows proved a\r\ndry reservoir. Due to operational problems the planned open hole logging\r\nprogram was restricted to GR/Sonic and Resistivity.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eNo cores were cut and no wire line fluid\r\nsamples were taken.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBodyText\u003e\u003cspan lang=EN-GB\u003eThe well was permanently abandoned on 17\r\nMarch 1996 as a dry well.\u003c/span\u003e\u003c/p\u003e\r\n\r\n\u003cp class=MsoBod",
    "wlbHistoryDateUpdated" : "2026-02-24T00:00:00"
  }
}